BBC2 photos provided by KNMI, Willem Hovius et al.


April: preparations are in progress, instruments being installed.


April ??th: Univ. of Wageningen brings rain gauges (let it rain, let it rain??)


April 17th: CELAR setting up and testing their instruments


April ??rd: sonics operated by Alterra installed in the tower


April 23rd: IfT Leipzig installs the Sodar/RASS


April 28th: Royal Engineers pave the road for MAPSY


April 29th: GKSS lidar and radar arrive


May 1st: Dutch Army meteo support group (first shift)



KNMI in full control (?)



Mammatus clouds above the remote sensing site



A different look on the BBC2 campaign by Olaf Posselt